SDA WA Demand Report
Western Australia
6 qualifying SA3 regions — where unhoused participants exceed total vacant rooms
Data current to 31 March 2026 · NDIA Supplement P Q3 2025–26 · publicproperty.com.au
Western Australia overview
6
Qualifying SA3s
1,869
Funded participants
1,101
Enrolled dwellings
881
Pipeline (SA4s)
SA4 Region
Perth - North West
2 qualifying SA3s
280
Funded
168
Not yet housed
117
Dwellings
81
Vacant rooms
128
Pipeline
Pipeline mix — HPS 92 · FA 6 · IL 6 · Robust 24  |  22 apt · 69 house · 33 villa · 4 GH
1
Stirling
Perth - North West SA4
Stirling 6021 · Scarborough 6019 · Karrinyup 6018 · Balcatta 6021 · Nollamara 6061
Participants P.17 · P.15
130
Funded, not yet housed
12
participants in group/legacy homes
183
Total funded participants
Demand vs supply by design category P.18 · P.14
People who need thisRooms that existShortage / Surplus Rooms
HPS4899-51
FA492+47
IL385+33
Robust168+8
Basic/Legacy0
Rooms estimated: dwellings × 1.6 avg rooms/dwelling. Basic/Legacy has no participant need.
Green (+) = undersupplied — more people than rooms — opportunity. Red (−) = oversupplied — more rooms than people — caution.
What housing exists right now P.15
TypeDwellingsRoomsVacant
1-resident404022
2-resident183619
3-resident92715
4+ resident (group home)3126
Total7011562
New vs older housing P.13 · P.15
70
New build dwellings (post-2016, NDIS compliant)
3
Legacy/group home dwellings
12 participants in group/legacy homes
NDIA payment SDA Pricing 2025–26 v2.0
0.99x
Location factor
$74,320
HPS per participant/yr
$222,960
HPS per dwelling (3 res)/yr*
The formula
Funded, not yet housed130
Total rooms (all dwellings)115
Currently housed− 53
Vacant rooms62
Source: P.17, P.15
Shortage / Surplus
68
participants with
nowhere to go
+12
participants in
group/legacy homes
2
Joondalup
Perth - North West SA4
Joondalup 6027 · Currambine 6028 · Edgewater 6027 · Heathridge 6027 · Ocean Reef 6027
Participants P.17 · P.15
38
Funded, not yet housed
17
participants in group/legacy homes
97
Total funded participants
Demand vs supply by design category P.18 · P.14
People who need thisRooms that existShortage / Surplus Rooms
HPS3560-25
FA312+29
IL1813+5
Robust52+3
Basic/Legacy2
Rooms estimated: dwellings × 1.7 avg rooms/dwelling. Basic/Legacy has no participant need.
Green (+) = undersupplied — more people than rooms — opportunity. Red (−) = oversupplied — more rooms than people — caution.
What housing exists right now P.15
TypeDwellingsRoomsVacant
1-resident31318
2-resident6123
3-resident6184
4+ resident (group home)4174
Total477819
New vs older housing P.13 · P.15
46
New build dwellings (post-2016, NDIS compliant)
4
Legacy/group home dwellings
17 participants in group/legacy homes
NDIA payment SDA Pricing 2025–26 v2.0
0.99x
Location factor
$74,320
HPS per participant/yr
$222,960
HPS per dwelling (3 res)/yr*
The formula
Funded, not yet housed38
Total rooms (all dwellings)78
Currently housed− 59
Vacant rooms19
Source: P.17, P.15
Shortage / Surplus
19
participants with
nowhere to go
+17
participants in
group/legacy homes
SA4 Region
Perth - South East
2 qualifying SA3s
161
Funded
88
Not yet housed
41
Dwellings
18
Vacant rooms
226
Pipeline
Pipeline mix — HPS 174 · FA 17 · IL 19 · Robust 15  |  31 apt · 140 house · 48 villa · 7 GH
3
Belmont - Victoria Park
Perth - South East SA4
Victoria Park 6100 · Belmont 6104 · Cloverdale 6105 · Kewdale 6105 · Rivervale 6103
Participants P.17 · P.15
61
Funded, not yet housed
0
participants in group/legacy homes
110
Total funded participants
Demand vs supply by design category P.18 · P.14
People who need thisRooms that existShortage / Surplus Rooms
HPS3137-6
FA3311+22
IL222+20
Robust87+1
Basic/Legacy0
Rooms estimated: dwellings × 2.2 avg rooms/dwelling. Basic/Legacy has no participant need.
Green (+) = undersupplied — more people than rooms — opportunity. Red (−) = oversupplied — more rooms than people — caution.
What housing exists right now P.15
TypeDwellingsRoomsVacant
1-resident661
2-resident9183
3-resident11335
Total26578
New vs older housing P.13 · P.15
26
New build dwellings (post-2016, NDIS compliant)
0
Legacy/group home dwellings
NDIA payment SDA Pricing 2025–26 v2.0
1.06x
Location factor
$78,644
HPS per participant/yr
$235,932
HPS per dwelling (3 res)/yr*
The formula
Funded, not yet housed61
Total rooms (all dwellings)57
Currently housed− 49
Vacant rooms8
Source: P.17, P.15
Shortage / Surplus
53
participants with
nowhere to go
4
Kalamunda
Perth - South East SA4
Kalamunda 6076 · High Wycombe 6057 · Forrestfield 6058 · Lesmurdie 6076 · Maida Vale 6057
Participants P.17 · P.15
27
Funded, not yet housed
0
participants in group/legacy homes
51
Total funded participants
Demand vs supply by design category P.18 · P.14
People who need thisRooms that existShortage / Surplus Rooms
HPS718-11
FA135+8
IL219+12
Robust220
Basic/Legacy0
Rooms estimated: dwellings × 2.3 avg rooms/dwelling. Basic/Legacy has no participant need.
Green (+) = undersupplied — more people than rooms — opportunity. Red (−) = oversupplied — more rooms than people — caution.
What housing exists right now P.15
TypeDwellingsRoomsVacant
1-resident441
2-resident362
3-resident8247
Total153410
New vs older housing P.13 · P.15
15
New build dwellings (post-2016, NDIS compliant)
0
Legacy/group home dwellings
NDIA payment SDA Pricing 2025–26 v2.0
1.06x
Location factor
$78,644
HPS per participant/yr
$235,932
HPS per dwelling (3 res)/yr*
The formula
Funded, not yet housed27
Total rooms (all dwellings)34
Currently housed− 24
Vacant rooms10
Source: P.17, P.15
Shortage / Surplus
17
participants with
nowhere to go
SA4 Region
Perth - North East
1 qualifying SA3  ·  sole — all pipeline lands here
117
Funded
71
Not yet housed
30
Dwellings
17
Vacant rooms
127
Pipeline
Pipeline mix — HPS 79 · FA 9 · IL 9 · Robust 16  |  11 apt · 80 house · 35 villa · 1 GH
5
Bayswater - Bassendean
Perth - North East SA4
Bayswater 6053 · Bassendean 6054 · Morley 6062 · Embleton 6062 · Bedford 6052
Participants P.17 · P.15
71
Funded, not yet housed
17
participants in group/legacy homes
117
Total funded participants
Demand vs supply by design category P.18 · P.14
People who need thisRooms that existShortage / Surplus Rooms
HPS3555-20
FA272+25
IL294+25
Robust52+3
Basic/Legacy0
Rooms estimated: dwellings × 2.1 avg rooms/dwelling. Basic/Legacy has no participant need.
Green (+) = undersupplied — more people than rooms — opportunity. Red (−) = oversupplied — more rooms than people — caution.
What housing exists right now P.15
TypeDwellingsRoomsVacant
1-resident15154
2-resident241
3-resident9277
4+ resident (group home)4175
Total306317
New vs older housing P.13 · P.15
30
New build dwellings (post-2016, NDIS compliant)
4
Legacy/group home dwellings
17 participants in group/legacy homes
NDIA payment SDA Pricing 2025–26 v2.0
0.93x
Location factor
$70,614
HPS per participant/yr
$211,842
HPS per dwelling (3 res)/yr*
The formula
Funded, not yet housed71
Total rooms (all dwellings)63
Currently housed− 46
Vacant rooms17
Source: P.17, P.15
Shortage / Surplus
54
participants with
nowhere to go
+17
participants in
group/legacy homes
SA4 Region
Perth - Inner
1 qualifying SA3  ·  sole — all pipeline lands here
60
Funded
33
Not yet housed
45
Dwellings
24
Vacant rooms
62
Pipeline
Pipeline mix — HPS 56 · FA 0 · IL 1 · Robust 0  |  47 apt · 7 house · 8 villa · 0 GH
6
Perth City
Perth - Inner SA4
Perth 6000 · West Perth 6005 · Northbridge 6003 · East Perth 6004 · Highgate 6003
Participants P.17 · P.15
33
Funded, not yet housed
0
participants in group/legacy homes
60
Total funded participants
Demand vs supply by design category P.18 · P.14
People who need thisRooms that existShortage / Surplus Rooms
HPS2545-20
FA245+19
IL80+8
Robust10+1
Basic/Legacy0
Rooms estimated: dwellings × 1.1 avg rooms/dwelling. Basic/Legacy has no participant need.
Green (+) = undersupplied — more people than rooms — opportunity. Red (−) = oversupplied — more rooms than people — caution.
What housing exists right now P.15
TypeDwellingsRoomsVacant
1-resident393918
2-resident6126
Total455124
New vs older housing P.13 · P.15
45
New build dwellings (post-2016, NDIS compliant)
0
Legacy/group home dwellings
NDIA payment SDA Pricing 2025–26 v2.0
1.24x
Location factor
$89,762
HPS per participant/yr
$269,286
HPS per dwelling (3 res)/yr*
The formula
Funded, not yet housed33
Total rooms (all dwellings)51
Currently housed− 27
Vacant rooms24
Source: P.17, P.15
Shortage / Surplus
9
participants with
nowhere to go
Note on SDA payment figures*
Maximum annual SDA payment under NDIA SDA Pricing Arrangements 2025–26. Assumes new-build, 3-resident HPS dwelling at full occupancy, with OOA, fire sprinklers, MRRC and location factor applied. Actual income depends on occupancy, participant plan funding, and provider agreement. This is the published price cap — not guaranteed income. An empty dwelling earns nothing.
Methodology

Shortage / Surplus = primary demand (P.17 "not yet housed") minus total vacant rooms (P.15 capacity minus P.17 housed). All dwelling types included.

Secondary demand = group home residents (4+ per dwelling). Shown separately — currently housed. Government intent is to defund legacy and group homes, but the NDIA has not published a transition timeline. Transition demand is context only, not confirmed near-term demand. Source: P.15.

Pipeline = SA4 context only, never subtracted. Source: P.8.

Qualifying: gap > 0, 50+ funded, 20+ unhoused. All data NDIA Supplement P Q3 2025–26.

Disclaimer

This report is generated from publicly available data published by the NDIA. All figures are indicative. Public Property Pty Ltd (ABN 21 656 016 830) accepts no liability for decisions made based on this report.

Terms of use

Single-user licence. Licensed to the individual purchaser only. Not for redistribution.

Copyright. © Public Property Pty Ltd 2026. All rights reserved.