SDA NT Demand Report
Northern Territory
1 qualifying SA3 region — where unhoused participants exceed total vacant rooms
Data current to 31 March 2026 · NDIA Supplement P Q3 2025–26 · publicproperty.com.au
Northern Territory overview
SA4 Region
Northern Territory - Outback
1 qualifying SA3 · sole — all pipeline lands here
Pipeline mix — HPS 12 · FA 4 · IL 0 · Robust 0 | 0 apt · 7 house · 9 villa · 0 GH
Participants P.17 · P.15
0
participants in group/legacy homes
79
Total funded participants
Demand vs supply by design category P.18 · P.14
| People who need this | Rooms that exist | Shortage / Surplus Rooms |
| HPS | 23 | 18 | +5 |
| FA | 30 | 3 | +27 |
| IL | 12 | 0 | +12 |
| Robust | 5 | 0 | +5 |
| Basic/Legacy | — | 3 | — |
Rooms estimated: dwellings × 1.7 avg rooms/dwelling. Basic/Legacy has no participant need.
Green (+) = undersupplied — more people than rooms — opportunity. Red (−) = oversupplied — more rooms than people — caution.
What housing exists right now P.15
| Type | Dwellings | Rooms | Vacant |
| 1-resident | 5 | 5 | 3 |
| 2-resident | 10 | 20 | 12 |
| Total | 15 | 25 | 15 |
New vs older housing P.13 · P.15
13
New build dwellings (post-2016, NDIS compliant)
0
Legacy/group home dwellings
NDIA payment SDA Pricing 2025–26 v2.0
$105,203
HPS per participant/yr
$315,609
HPS per dwelling (3 res)/yr*
The formula
Funded, not yet housed69
Total rooms (all dwellings)25
Currently housed− 10
Vacant rooms15
Source: P.17, P.15
Shortage / Surplus
54
participants with
nowhere to go
Note on SDA payment figures*
Maximum annual SDA payment under NDIA SDA Pricing Arrangements 2025–26. Assumes new-build, 3-resident HPS dwelling at full occupancy, with OOA, fire sprinklers, MRRC and location factor applied. Actual income depends on occupancy, participant plan funding, and provider agreement. This is the published price cap — not guaranteed income. An empty dwelling earns nothing.
Methodology
Shortage / Surplus = primary demand (P.17 "not yet housed") minus total vacant rooms (P.15 capacity minus P.17 housed). All dwelling types included.
Secondary demand = group home residents (4+ per dwelling). Shown separately — currently housed. Government intent is to defund legacy and group homes, but the NDIA has not published a transition timeline. Transition demand is context only, not confirmed near-term demand. Source: P.15.
Pipeline = SA4 context only, never subtracted. Source: P.8.
Qualifying: gap > 0, 50+ funded, 20+ unhoused. All data NDIA Supplement P Q3 2025–26.
Disclaimer
This report is generated from publicly available data published by the NDIA. All figures are indicative. Public Property Pty Ltd (ABN 21 656 016 830) accepts no liability for decisions made based on this report.
Terms of use
Single-user licence. Licensed to the individual purchaser only. Not for redistribution.
Copyright. © Public Property Pty Ltd 2026. All rights reserved.